You don't have javascript enabled. Good luck with that.
Pencarian
MRT Fase II Mulai Digarap, PT MRT Jakarta Targetkan 500 Ribu Penumpang Perhari

MRT Phase II Targets 500 Thousand Passengers Per Day

Mass Rapid Train (MRT) Phase II that connects Hotel Indonesia (HI) Raundbout to Ancol Barat is targeted to transport 500 thousand passengers per day when it is operated.

We are targeting 500 thousand passengers because it has large coverage and longer route

"That target is quite realistic because MRT Phase II has a longer route from Lebak Bulus to Ancol Barat," conveyed PT. MRT Jakarta President Director, William Sabandar, Monday (11/11).

Moreover, MRT Phase II route passes through densely populated areas, tourist sites, and business economic centers.

MRT Phase II Depot Location Being Reviewed

"Besides, from its operational and punctuality, we can ensure this transport is almost 100 percent perfect. It becomes very reliable and long-awaited by the public," he mentioned, while explaining about current process of MRT Phase II that has entered auction stage.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye832 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye607 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye565 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye550 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye457 personFolmer